Workspace Organization: Building and Refinement
Use this page during Classes 2 and 3. Build the simplest functional structure first, then test and improve it.
Return to the Project Overview for the complete requirements.
Class 2: Begin fabrication
Before building
- Confirm measurements, materials, and construction order.
- Identify hazards and complete the teacher’s required safety instruction.
- Check that the plan combines at least two materials and/or fabrication techniques for clear design reasons.
Vacuum forming
Vacuum forming heats an approved plastic sheet until flexible, then uses air pressure to draw it over a master or mold. Common applications include trays, packaging, covers, panels, and shaped product housings.
- Use only approved forming sheets and suitable masters.
- Smooth surfaces and gentle draft angles help a formed part release.
- Avoid undercuts that can trap the master.
- Keep components small and simple, such as a tray, pocket, divider, or fitted holder.
- Heated plastic and machine surfaces can burn.
- Follow the school’s approved instructions for heating, forming, cooling, mold release, and trimming.
- The teacher will demonstrate and supervise the machine.
One shared machine
Vacuum forming is optional. Join the small production queue when called. While waiting, continue measuring, cutting, assembling, photographing, documenting, or refining. The organizer must succeed without a formed part.
Productive construction
- Build the main structure before optional details.
- Measure and mark before cutting.
- Check fit and alignment before permanent assembly.
- Photograph important stages and unexpected problems.
- Store labelled work and clean the workspace correctly.
Class 2 evidence
- Measurements and material choices confirmed
- Safe construction started
- Main structure underway
- Initial construction problem and next step documented
- Progress photographs saved
- Individual Notion entry complete
Optional 3D printing
Small original brackets, clips, connectors, holders, or dividers may be requested. Check dimensions and printability, explain the function, and maintain a non-printed alternative. All requests are due by the end of Class 3.
Class 3: Test and refine
Continue construction until the organizer is mostly functional. Test it using the actual items it was designed to hold.
| Check | Evidence to record |
|---|---|
| Stability | Does it remain secure during normal use? |
| Storage | Does it hold the intended items or categories? |
| Access | Can the user retrieve and return items easily? |
| Identification | Are storage locations clear? |
| Footprint | Does it use the available workspace efficiently? |
Identify at least one weakness. Make one deliberate improvement based on testing, and record before-and-after evidence.
Final 3D-printing deadline
Submit every optional STL and print request through the existing workflow by the end of Class 3. Late or unsuccessful prints cannot delay the project. Continue building a workable alternative.
Class 3 evidence
- Mostly functional organizer
- Purposeful combination of at least two materials and/or fabrication techniques
- Test completed with the intended items
- Weakness identified from evidence
- Purposeful improvement completed
- Before-and-after evidence saved
- Optional print request submitted by the deadline
- Individual Notion entry complete